An overview of the Saigon River.
Spanning 78.20 km, the road which may have between 4-8 lannes, will run alongside the river from Cu Chi District through the city centre to Can Gio Bridge.
The VND2.10-trillion project will be carried out before 2030.
The riverside road will also connect to three belt roads 2, 3, and 4, Ben Luc - Long Thanh Expressway to complete the traffic system in the southeastern region.
The riverside road is expected to better connect HCM City, Binh Duong and Tay Ninh, ease traffic flows for national roads and boost commercial, service, and tourism links between these localities.
In the planning, there will be an underpass built along Ton Duc Thang Street section from Ba Son and Khanh Hoi bridges.