The slow clearance of land and a lack of consensus are likely to mean the Cat Linh - Ha Dong urban railway is not built within the scheduled four years.
A tunnel will be built through the 12km Ca Pass in Phu Yen to ease traffic and reduce accidents on National Highway 1 linking the country\'s north and south.